Student Accommodation Hot Water Vessel Replacement
Overview
The Shield Mechanical, Electrical & Facilities Services division was contracted by our client to remove and replace an existing hot water storage vessel from a busy student accommodation site in Nottingham.
The client had identified the need to upgrade the storage vessel resulting in the requirement to remove the existing long-serving, 2000 litre solution with a new, bespoke manufactured 3000 litre alternative.
Download PDF