Cathedral Park – Bristol

“Fortis Vision worked with Shield Services Group delivering an AOV and roof light replacement scheme for a student residential property.

The property in question is a grade II-listed cathedral in central Bristol. This complex scheme involved a full building scaffold cover to accommodate a temporary roof whilst the works were undertaken.

Shield’s commitment to compliance in design and then to delivery was outstanding and we, as the principal contractor felt at ease that this phase of the project was well looked after.

The project was delivered live with students still residing within the property, and with a full-height scaffold structure erected internally as well as crane operations externally, this was a real challenge to manage on the ground.

The delivery team were both accommodating and dynamic to the situation and the project was successfully delivered on time and in budget. Fortis Vision really enjoyed working with Shield Services Group on this project and look forward to potential collaborations in the future.”

Joel Phillips, Construction Manager

Scaffolding

Overview

Shield Services Group were engaged by Fortis Vision to erect a 50m temporary roof structure over Cathedral Park in Bristol City Centre. Cathedral Park is a Grade II listed cathedral that was converted into student accommodation in 2012 and is home to over 250 students.

 